From First Call to Final
Handover
Every LHC project follows the same proven 6-step process — a system refined over 30
years to ensure your project is delivered beautifully, on time, and without surprises.
Free Consultation & Site Visit
We begin with a no-obligation conversation — in person at our Anna Nagar office, by phone, or via WhatsApp. We visit your site, understand
your vision and budget, and give you an honest initial assessment.
Duration
1–2 days from first contact
Cost
Completely free
What You Get
Honest budget estimate and feasibility view
Available For
Construction, JV, Renovation, Interiors
Design, Planning & Approvals
Our architectural team prepares detailed drawings. We handle all CMDA/DTCP approvals, soil testing, structural design, and material specifications. You review and approve everything before we move forward.
Duration
4–8 weeks depending on approvals
Deliverables
Floor plans, elevations, structural drawings
Approvals
CMDA, DTCP, RERA registration
Client Sign-Off
Required before construction begins
Contract & Payment Schedule
A transparent, milestone-based contract is signed. Payments are tied to verified construction milestones — not arbitrary dates. You never pay ahead of work completed.
Milestones
Foundation, slab, brick, plaster, finishing, handover
TDS & Retention
Clearly stated in contract — no hidden deductions
NRI Clients
Digital signing and online payment options available
Legal Review
We welcome your lawyer to review all documents
Construction — Milestone by Milestone
Construction begins with a site inauguration. Our engineers are on-site daily. You receive weekly progress reports with photographs. You may visit the site at any time.
Site Supervisor
Dedicated supervisor on site every day
Weekly Reports
Photo and video updates every Friday
Quality Checks
Stage-wise quality inspection at every milestone
Client Visits
Anytime, with 24-hour prior notice
Finishing, Fittings & Snag Review
In the final stage, all interior finishing, fixture installation, painting, electrical, and plumbing completion is carried out. A formal snag list is prepared and all items are closed before handover.
Snag List
Formal documented punch-list, fully resolved
Water Test
Full plumbing and drainage pressure test
Electrical Test
Certified electrical safety check
Client Walk-Through
You inspect every room before acceptance
Handover & Post-Handover Support
We hand over your keys with a complete documentation package including completion certificate, quality assurance documents, and an as-built drawing set. Our support line remains open for 1 year post-handover.
Documents
Completion certificate, quality documents, as-built drawings
Engineering Quality
Built to exceed BIS standards, engineered for generations
Post-Handover
1-year support line for minor issues
RERA Compliance
Full RERA documentation provided